CORE 12-10-12
·
Initial
findings from Peter L showed that we don't have enough elevation difference to
have the walkout arrangement shown on all out drawings...easily.
o If the front of the
school is at 784 and there is no articulation between it and the front of
school building and the studio/shops then the back of the shops will need to be
794 (+ 2 or more for drainage).
o This gives us a
grade difference of 10' between front and back. A flat quad between
the existing school and the shops and also a big useable flat field in the
upper area.
o The new DRB date is
Jan. 8th whatever is the second Tuesday in Jan
Materials need to be in the week before…..Kate will research and inform.
Materials need to be in the week before…..Kate will research and inform.
·
RESOLVED:
Connect the building envelopes for the residential units and the shop studies.
·
RESOLVED:
Kathy and Kin will be working up a turn-around for the entry.
·
RESOLVED:
Remove the trees along the entry axis...or some of them.
·
RESOLVED:
We need a Landscape Team to undertake the resolution of:
o The turnaround.
o The pedestrian
access.
o The Quad between
the main building and the new buildings.
o What the look will
be through the different phases.
·
ACTION: Peter L to update the site plan
o
Topography
o
Path alignments
o
Connect all building envelopes
o
Lighting (narrative)
o
Screening (narrative)
o
Turn off old parking lot boundary
o
Label greenhouse and everything else….