Tuesday, May 13, 2014

Current Documents

This is intended as a resource for Yestermorrow students and instructors using the Yestermorrow campus as a site for design projects. It includes links to current site plans, maps, and supplemental material relevant to the development of the campus and will be continually updated as new versions become available.

Plans currently approved by the Waitsfield Development Review Board:
Master Plan Executive Summary (06.29.13)
Master Plan Site Plan 50' scale (06.29.13)
Master Plan Site Plan 100' scale (06.29.13)
Master Plan Site Plan 100' scale open space (06.29.13)

Main Building: *note= not totally accurate as-builts
Ground Floor Plan
First Floor Plan
Building Section

Site Information:
Campus Map with Building Descriptions (not to scale) (2014)
Campus Base Map 80' scale (2008)
Campus Base Map 40' scale (2008)
Orthophoto

Base Maps for Area:
Mad River Topo (North)
Mad River Topo (South)
Waitsfield Natural Resources
Waitsfield Prime Ag Soils
Waitsfield Fluvial Erosion Zones
Waitsfield Zoning
Area Topo

Supplemental Reports:
Forest Management Plan (2013)
Stormwater Feasibility Study (2012)
Stormwater Concept Design (2012)
Watershed Analysis (2012)
Wastewater Basis of Design (2013)
Regenesis Grounding and Process Report (2011)
Regenesis Story of Place Presentation (2011)
Yestermorrow Environmental Assessment (2011)

No comments:

Post a Comment