CORE 3-30-15 - site review
Agenda:
- Report back on ideas regarding driveway reconfiguration (Kate/Eric)
- How to finalize site plans showing Phase 1 and overall Master Plan for Act 250 (John)
- Discuss remaining Act 250 application questions that have not been resolved (Kate)
- Draft RFP for design/build (Eric/John)
- Planning April 18th charrette
Notes:
Peter is still waiting for Tony and Andres. Tony hopes to have the grading done
shortly.
Peter & the CAD work.
·
New
Access
·
Old
and new Masterplan information from DRB
·
Phasing
to be imported into CAD
o JC to place PDF
into layers to reflect phases
·
This
year site work and wetlands but the chalet will be there for several years.
PARKING
·
Upper
and lower?
·
How
many spaces…..50?
·
Upper
parking will be appreciated by those building the first building.
·
Straight
access versus curvilinear alignment.
Charette & Design Schedule
·
April
18th
·
Roadway
treatment
·
Landscape
architect - management
o Permaculture
opportunities
o Phasing
Project Management Coordinating:
·
Master
planner/Architect
(Tony as the planner…?)
(Tony as the planner…?)
·
Siteplan
·
Building
Design
·
Permitting
·
Construction
scheduling
RESOLVED:
Tony, Andres and Elizabeth will convene
this week and produce an integrated proposal to be considered as the final
submission for the Act 250.
UNRESOLVED:
Time ran out before we could discuss the
RFP.
A lot of time was spent around whether the
current roadway alignment was acceptable. It works with the stormwater
design and it works with the buildings (both existing and proposed) but the
actual character of walking up the road needs further development.