June 7, 2012
TO DO: Show map with ……
by Monday,
June 11th
- preferred drive alignment. Preserve a 10' buffer and assume that we can slightly modify.
- show Intern house footprint in most uphill notch
- remove half of the tent platforms
- remove dotted footprints of other residential units (Regenesis design)
- add in a graphic to show that the buildings are connected
- add numbers to all buildings and place key on plan
- change color of all existing buildings that are planned for demolishment.
- move the materials storage over to the south of the shops and put the office/management above it.
- dot in existing parking area as something to be demolished but also to show that we aren't actually creating a huge new parking lot (impervious).
- show intended parking spaces
- show tree line along existing drive diminished by half (every other tree)
Tony & Andres - CORE team to pick up with this contract and have them
detail the daylighting of the stream and see if we can develop a better setback
relationship with regard to the planned cabins.
Solar/Shade Study:
The initial study will assume that all the trees are at one
height. Initially, that height will be 30' - 60'
DRB application needs to be scheduled. We need to return to
the DRB within 6 months of our original SketchPlan Review. That puts us
sometime in July.
Kate will get with Susan Sennig to nail this down.